When an end user assumes these responsibilities by purchasing through a manufacturer, it can increase the cost per square foot dramatically. Managing a flooring installation project can require 6 to 12 hours of management time per 10,000 square feet depending on the complexity of the project. This time is spent arranging deliveries, planning the installation, scheduling elevators or cranes, verifying material arrival, monitoring job site deliveries, overseeing actual installation and inspecting the final result.